Delimara Power Station
Lorraine Gravino2026-09-03T10:02:13+02:00Delimara Power Station – IPPC Permit IP 0005/25 (Framework) Delimara Power Station – Enemalta Subsidiary Permit IP 0005/25 (iii) Image - viewingmalta.com [...]
Delimara Power Station – IPPC Permit IP 0005/25 (Framework) Delimara Power Station – Enemalta Subsidiary Permit IP 0005/25 (iii) Image - viewingmalta.com [...]
Our EMS Our Environmental Management System (EMS) comprises a set of operational procedures, or in simpler terms, a way of doing things. It leads to a reduction in the [...]
ISO 14001 certified The ISO 14001is an internationally-recognised standard that specifies the latest requirements for an EMS. This allows an organisation to: set up and implement an environmental policy; [...]
Our Environmental Policy Our Environmental Policy is the foundation of the Environmental Management System. It declares our commitment to environment protection in all its operations. Download Marsa Power [...]
Environmental permits Here are some of the environmental permits that we require to operate our electricity distribution and generation infrastructure: Greenhouse Gas Emissions Permit MPS Greenhouse Gas Emissions [...]
Emissions monitoring We record the emission values from all stacks of our electricity generation infrastructure on a daily basis. Our online continuous emissions monitoring system displays information graphically or [...]
Air Quality Monitoring As part of our commitment to improved air quality in the area of our main electricity generation infrastructure, the Delimara Power Station, we commission air quality [...]
Fuel Mix for Energy distributed by Enemalta plc. in 2025 Fuel mix is the ratio of different fuels or energy sources Enemalta plc. uses to provide electricity to its [...]
COMAH Information Emergency Booklet Information Booklet Pull Out Map Image - viewingmalta.com