EMS/SMS documents
All bidders presenting proposals, quotes or tenders to provide products or services to Enemalta plc are required to complete (and include with their submission) the below form, after familiarising themselves with the respective Standard Operating Procedures and Briefing Documents included in with the same document.
Click here to download the FRM 042 (DOC 2) – Contractor’s Briefing and Employee Training
These specifications and instructions below form part of Enemalta’s ISO14001-certified Environment Management System (EMS) and need to be followed by all contractors working for the Company.
Major Accident Prevention Policy
Environment Policy Marsa Power Station (English)
Environment Policy Delimara Power Station (English)
MAN 001 (DOC 11) – MPS Briefing Document for Contractors and Visitors
MAN 008 (DOC 12) – DPS Visitors Safety Card
MAN 003 (DOC 13) – Distribution Briefing Document for Contractors and Visitors
SOP 0044 – Oil and Chemical Storage, Handling and Spill Control for Contractors
SOP 0045 – Waste Management Procedure for Contractors
SOP 0046 – Contractor Maintenane of AC units