The problem in this case could be that the maximum contracted power on the meter is being exceeded. It is very important that prior to applying for an EV meter, the total connected load including the EV charging unit are within the single-phase contracted load (40A). Otherwise, one would have to apply for an additional load. It is recommended that applicants seek and consult an independent electrician.